Investment in a 40-ton circulating fluidized bed boiler costs millions of dollars, and many users have an early budget before buying the boiler, and would like to know in advance what is the cost of a 40-ton circulating fluidized bed boiler? Today, the small staff of ZOZEN boiler co., ltd. will talk about how much it will cost to invest in a 40-ton circulating fluidized bed boiler.
If you want to know the price of the 40-ton CFB boiler body, you need to first determine the basic furnace type of the 40-ton CFB boiler: is it used for production, power generation or heating? Do you need steam boiler or hot water boiler? What are the boiler models, etc. Next, let's look at the models of 40-ton circulating fluidized bed boilers.
1. DHX40-1.25-A, which belongs to DHX type circulating fluidized bed boiler, is a single drum horizontal circulating structure. The price quoted for this furnace is over 3 million yuan, and the price quoted for accessories is calculated separately. The boiler is based on energy-saving circulating fluidized bed combustion technology, which overcomes the problems of high service power consumption and high abrasion of conventional circulating fluidized bed boilers.
2. SHX40-2.5-H, this model is SHX circulating fluidized bed boiler, its use is mainly for industrial production and processing, and the quotation is between 2 million and 3 million. This boiler is the fourth generation of internal circulating fluidized bed steam boiler. It has patented design of return device, unique structure design of separator, anti-wear design of buried pipe, etc.
Auxiliary equipment of 40-ton circulating fluidized bed boiler also includes auxiliary equipment such as primary air blower, secondary air blower, condensate pump, circulating water pump, feed water pump, vulcanizing air blower, induced draft fan, etc. Enterprises must give priority to quality and supplement price when purchasing. Because the boiler is a bulk boiler, the faults are usually on the auxiliary machine, so the choice of auxiliary machine must be careful.
Transportation costs are generally well understood. Transportation costs refer to the transportation distance from the manufacturer to the project installation site. Transportation costs vary according to the distance. At the same time, it will also charge according to the amount of boiler accessories. At first glance, is it a bit like logistics express? However, it is different. The transportation cost can be transported by the manufacturer or by itself, but the manufacturer is not responsible for any accident during the transportation. The installation of the 40-ton CFB boiler mainly includes two aspects: the installation cost of the 40-ton CFB boiler body and auxiliary equipment and the installation cost of the 40-ton CFB boiler project. In this process, there are many problems that need to be paid attention to, for example, carefully check the drawings before installation. During installation, attention should be paid to every detail, even a small screw cannot be taken lightly. After the installation is completed, all aspects must be checked before it can be put into use. This whole process needs a professional team to complete.